Teledyne-lecroy Protocol PCI Express Script Automation Test Tool Instrukcja Użytkownika Strona 35

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 55
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 34
Teledyne LeCroy PCI Express Script Automation Test Tool User Manual
31
3.1.2.4 Tests Requiring DUT Actions
The following three tests require some DUT actions to check all assertions. When the test is executed, the
PCI Express Script Automation Test Tool instructs the PETrainer™ to wait for the specific DUT action at the
proper point with the timeout of four seconds.
If the DUT does not send the expected TLP, the test proceeds to the next stage. When verification is executed, it
checks for the presence of the DUT actions at the proper stages.
If the DUT did not send the TLPs expected, the corresponding assertions are not checked, and the notification is
given in the log.
If no assertions could be checked for a test run, it is declared DONE rather then PASSED or FAILED.
Przeglądanie stron 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 54 55

Komentarze do niniejszej Instrukcji

Brak uwag